Uxbridge WWTP BNR Upgrades
Demolition, reconstruction, and upgrades to the Uxbridge Wastewater Treatment Facility to meet Biological Nutrient Removal goals.
Client: | Town of Uxbridge, MA | |
Designer: | GHD Inc. | |
Size: | 2.5 MGD |
Project Features
- Enlargement of the three existing Aeration Basins
- New Aeration Basin No. 4
- New Gravity Thickener No. 2
- New Secondary Clarifier
- New Filtration and Chemical Buildings
- Conversion of two existing chlorination basins to UV Disinfection and post-aeration
- Admin Building renovations and new Maintenance Garage
- Stormwater and yard piping improvements
- Switchgear, instrumentation and controls replacements throughout the plant
- Multiple temporary bypass systems
Tags: GC, Heavy, Infrastructure, Massachusetts, Water/Wastewater