Smithfield WWTP Tertiary Treatment Upgrade
Construction of a new Tertiary Treatment Facility at the Smithfield WWTP in Rhode Island.
Client: | Town of Smithfield, RI | |
Designer: | Wright-Pierce Engineers | |
Capacity: | 3.5 MGD |
Project Features
- New Tertiary Treatment Building.
- New Ballasted Microsand Flocculation Tertiary Treatment System.
- Additions to the Administration/Sludge Handling Building ferric chloride feed equipment.
- New lime silo and feed system.
- This was the first Ballasted Flocculation Facility of its kind installed in RI.
Tags: GC, Heavy, Infrastructure, Rhode Island, Water/Wastewater