Northfield Mount Hermon School – Infrastructure

As part of Northfield Mount Hermon School’s plan to consolidate all operations onto one campus, DOC was retained as design/builder for infrastructure work to support proposed and existing buildings.

Client:   Northfield Mount Hermon School
Designer:  Berkshire Design Group
 

Project Features

  • New steam and condensate line along the inner loop.
  • Sanitary sewer system replacement.
  • Expansion of the storm water system.
  • New 10” domestic water line connected the east end of campus to a new upper campus loop.
  • New 13.8 KV high voltage feed incorporated the current 2,400 volt system.
  • Provided capacity for future building.
  • Existing overhead telephone/data feeds relocated to underground distribution.