Lyman Street Bridge Replacement

Replacement of the Lyman Street Bridge superstructure over the first level canal in Holyoke, MA. 

Client:   MassDOT
Designer:  Commonwealth Engineers, Inc.
 

Project Features

  • New steel beam bridge superstructure and reinforced concrete deck.
  • Demolition and removal of the existing bridge.
  • Earth excavation and backfill.
  • Concrete abutments.
  • Concrete sidewalks and CP-PL2 barriers.
  • Relocation of existing utilities and reconstruction of roadway approaches.
  • Creative suspension of existing utility lines under the temporary pedestrian walkway.
  • Completed 18 months ahead of schedule.

Tags: , , , ,