Hanscom Air Field Runway 11-29 Rehabilitation

This fast-paced project involved repaving of Runway 11-29, the most-used runway at Hanscom Air Field located in Bedford, MA.

Client:   Massachusetts Port Authority
Designer:  McFarland Johnson
Size:  7,000 FT runway
 

Project Features

  • Milling and rubblizing the original concrete runway below.
  • Paving and striping new asphalt.
  • Reclaiming of the end areas.
  • Totaled over 50,000 tons of paving material.
  • Due to runway usage, a mere 30 days window was given to complete the bulk of the work.
  • Work completed 59 minutes ahead of schedule.

Tags: , , , ,