Bucklin Point WWTF Upgrades

Work consisted of modifications to provide improved nitrogen removal at the Bucklin Point Wastewater Treatment Plant located in East Providence, RI.

Client:   Narragansett Bay Commission
Designer:  CDM Smith
Size:  46 MGD
 

Project Features

  • Six new final clarifiers.
  • Two new sludge thickeners.
  • New sludge pumping station, RAS Pump vault and force main.
  • Modifications to existing aeration basins.
  • Modifications to the Blower Building including two new high speed turbo blowers.
  • Process/mechanical improvements throughout the facility.
  • New chemical feed systems.
  • Upgrades to the Wet-Weather Disinfection Building.
  • Conversion of the site electrical distribution from 600-V to 480-V.
  • Major flood protection improvements installed around the site perimeter.

Tags: , , , ,