Baileyville Compressed Natural Gas Filling Station

Baileyville Compressed Natural Gas (CNG) Station was an EPC contract awarded to DOC which included the design and construction of a fast fill CNG trailer loading station. The station consisted of four Ariel Compressors and two PSD dryers with a max thru put of 8000 SCFM at 4000 psi. The station is completely automated to include transfer grade metering and two pressure cuts of over 600 psi.

 

Tags: , , ,