Uxbridge WWTP BNR Upgrades

Demolition, reconstruction, and upgrades to the Uxbridge Wastewater Treatment Facility to meet Biological Nutrient Removal goals.

Client:   Town of Uxbridge, MA
Designer:  GHD Inc.
Size:  2.5 MGD
 

Project Features

  • Enlargement of the three existing Aeration Basins
  • New Aeration Basin No. 4
  • New Gravity Thickener No. 2
  • New Secondary Clarifier
  • New Filtration and Chemical Buildings
  • Conversion of two existing chlorination basins to UV Disinfection and post-aeration
  • Admin Building renovations and new Maintenance Garage
  • Stormwater and yard piping improvements
  • Switchgear, instrumentation and controls replacements throughout the plant
  • Multiple temporary bypass systems

Tags: , , , ,