SFWMD S-333N Canal Gate Structure

Construction of a concrete gate structure built just north of the existing S-333 Structure to provide additional operational flexibility and conveyance of flows to Everglades National Park.

Client:   South Florida Water Management District
Designer:  Erdman Anthony
Size:  1,150 cfs
 

Project Features

  • New concrete two (2) gate spillway structure
  • Canal excavation
  • Levee construction and stabilization
  • New air boat ramp
  • New control building with instrumentation, motor operators, telemetry
  • Site lighting, sidewalks and pavement
  • Underground propane tank
  • Horizontal directional drill under the L-29 canal

Tags: , , , ,