MWRA Deer Island Project

Part of the Boston Harbor Cleanup Project, the North System Headworks Facility provides preliminary treatment of wastewater by screening out large objects that would damage equipment. Construction includes a grit facility, primary pretreatment gallery, primary treatment control building and two odor control facilities. DOC served as general contractor in a joint venture with Barletta Engineering Corporation.

image

image

 



License NBR CGC1519199