MDC Aeration & Final Settling Tanks

The project includes the furnishing and installation of two new aeration tanks and two new final settling tanks with associated equipment. Leveling of effluent weirs in existing tanks 1-6, new RAS pump with valves and flow meters, sitework, piles earth retention, yard piping, HVAC, electrical, instrumentation and new VFD’s for existing RAS are included.



License NBR CGC1519199