Holyoke Hospital
Phase 1 of this project added a surgical suite with two operating rooms and support space. Phase 2 included a two-story steel frame addition to the existing hospital structure. Use of the operating suite and hospital beds on the top floor of the existing building continued during construction. This multi-phase project required tight scheduling and project management to minimize disruptions to ongoing hospital activities.
