This project involved the removal of the existing #5 dam, a timber crib structure dating from the 1890s. The new concrete dam has adjustable crest gates. The entire flow of the Deerfield River was diverted through the hydroelectric generating station during construction. The bridge between Rowe and Monroe, MA was removed during construction and rebuilt upon completion of the new dam. DOC served as general contractor on the project.