Gardner Falls Hydroelectric Tailrace #2 Repair Project

Work includes excavation and installation of a support of excavation system, removal of damaged pipe sections with minor concrete demolition, installation of new replacement steel tailrace pipe, backfilling of pipe with granular structural fill, placement of new concrete slab at the generator floor, removal of two temporary steel bulkheads and final site grading and seeding on the exterior of the powerhouse.