Bucklin Point WWTF Biogas Cogeneration System

The work generally consists of installation of new biogas conditioning equipment, new gas blending equipment, new biogas fueled cogeneration equipment including associated heat recovery and dissipation systems and new electrical infrastructure at the Narragansett Bay Commission Bucklin Point Wastewater Treatment Facility in East Providence, RI. The existing biogas piping, biogas fueled boilers and hot water system must remain in service during the entire construction period.